Based on the time taken to update 0.12 to 0.14, irrlicht 1.0 should beleased in 817 days . Thats only 2.3 years!
yey for me
1.0 release date :D
Bt this would mean to go through 0.2 and all the others again in the near future. And going back to 0.9 could make this process much faster. and if you start reading the numbers after dot correctly it will take infinitely long since we have an unbounded numner of naturals which may come after the dot.
Re: 1.0 release date :D
noErUs wrote:yey for me
well if we're gonna get that technical about it the argument that 0.11, 0.12, and 0.14 are older than 0.2-0.9hybrid wrote:Bt this would mean to go through 0.2 and all the others again in the near future. And going back to 0.9 could make this process much faster. and if you start reading the numbers after dot correctly it will take infinitely long since we have an unbounded numner of naturals which may come after the dot.
and what of 0.4.1?
-
- Posts: 448
- Joined: Tue Oct 05, 2004 3:24 am
- Location: Boston, MA
0.4.1.0 would be a nice new number. But hey Niko is only one man and he is doing a great job on his own.
Irrlicht Moderator || Game Designer
Learn the basics at </dream.in.code>
Learn the basics at </dream.in.code>
-
- Posts: 448
- Joined: Tue Oct 05, 2004 3:24 am
- Location: Boston, MA
oh sorry I must have miss read your post
Irrlicht Moderator || Game Designer
Learn the basics at </dream.in.code>
Learn the basics at </dream.in.code>